October

Planning next month's bathroom budget? This month closes in

00 : 00 : 00 : 00

Send Photos →
Finished bathroom renovation with petrol-green stacked wall tiles, a floating oak vanity, brass tap and a frameless glass walk-in shower (illustrative image)

Kuala Lumpur & Putrajaya

Bathroom Renovation in Kepong: Packages, Prices & Process

Better Bathrooms, Thoughtfully Built, for homes in Kepong

Kepong homes have seen decades of daily use, and their bathrooms often show it. Start with photos and we take it from there.

Why homeowners start with BathWorks Malaysia

  • Prices on the page

    Starting prices and package ranges, before you ask.

  • Itemised written quote

    Final price set after a site visit, line by line.

  • No surprise extras

    Hidden damage is photographed and priced for your OK.

Kepong

What Shapes a Bathroom Renovation in Kepong

Kepong grew around older housing estates, a busy industrial area and the green edge of the forest research reserve, and many of its terrace houses and flats have bathrooms that were never rebuilt. Hairline cracks in old tile grout let water creep into walls and slabs, which is why waterproofing, from RM1,500 per job, is often the first item worth pricing. Owners renovating upstairs bathrooms in double-storey homes tend to notice ceiling stains below first. For Kepong, send photos on WhatsApp and a site-visit date is confirmed there.

Services

Bathroom Renovation Services, One Job or the Whole Room

Every price is a starting price for that job. Your quotation sets the final figure.

Full Bathroom Renovation

The whole room, stripped back and rebuilt.

  • Hacking and disposal
  • New floor and wall tiles
  • Waterproofing
  • Plumbing upgrade

FromRM5,000per project

Quote This Job

Bathroom Tiling

Floors and walls in porcelain, ceramic or mosaic.

  • Floor and wall tiling
  • Porcelain, ceramic or mosaic
  • Tile supply confirmed in quotation

FromRM25per sq ft

Quote This Job

Bathroom Waterproofing

A waterproofing membrane under the finish.

  • Membrane application
  • Wet-area floor and wall base

FromRM1,500per job

Quote This Job

Bathroom Plumbing Upgrade

Old pipes replaced, leaks fixed.

  • Replace old pipes
  • Fix leaks
  • Upgrade bathroom plumbing

FromRM500per job

Quote This Job

Shower Screen Installation

Tempered safety glass, made to your opening.

  • Frameless, semi-frameless or sliding
  • Sliding or swing door
  • Custom sizes

FromRM800per installation

Quote This Job

Vanity & Cabinet Installation

Custom vanities and storage cabinets.

  • Wall-mounted or floor-standing
  • Vanity and storage cabinets

FromRM1,200per installation

Quote This Job

Bathtub to Shower Conversion

Old bathtub out, walk-in shower in.

  • Bathtub removal
  • Walk-in shower conversion

FromRM3,500per project

Quote This Job

Every price above is a starting price. Your final price is set in the written, itemised quotation after a site visit.

Packages

Three Renovation Packages, Scope Side by Side

Read across a row to see what changes between packages.

Essential

Indicative range

RM5,000 – RM8,000

A clean refresh on a careful budget.

Tiles

Basic tile replacement

Fixtures

Standard fixtures (basin, toilet)

Waterproofing

Basic waterproofing

Plumbing

Standard plumbing

Shower

Not listed

Vanity & mirror

Not listed

Options & extras

Not listed

Standard

Indicative range

RM8,000 – RM15,000

Modern finishes with glass and storage.

Tiles

Premium porcelain tiles

Fixtures

Quality fixtures & fittings

Waterproofing

Full waterproofing membrane

Plumbing

Not listed

Shower

Shower screen + rain shower head

Vanity & mirror

Vanity cabinet

Options & extras

Not listed

Premium

Indicative range

RM15,000 – RM30,000+

Designer materials and smart options.

Tiles

Designer tiles & natural stone

Fixtures

Premium branded fixtures

Waterproofing

Included (scope in quotation)

Plumbing

Not listed

Shower

Frameless glass shower screen

Vanity & mirror

Custom vanity & mirror cabinet

Options & extras

Underfloor heating option, smart toilet option, full electrical rewiring

Ranges are estimates. The final price depends on bathroom size, materials and scope, and every quotation covers materials, labour, waterproofing and cleanup.

Before & after

Before and After: A Tired Bathroom, Rebuilt

Drag the handle to compare. Your own photos are the starting point for your quote.

Dated bathroom with small pink wall tiles and a built-in bathtub before renovation (illustrative image)
The same bathroom after renovation with a walk-in glass shower, petrol-green tiles and an oak vanity (illustrative image)

Before

After

Bathtub to walk-in shower conversion in a terrace house bathroom

Process

How a Bathroom Renovation Moves from Photos to Handover

Four steps, each one agreed in writing before the next.

  1. Send photos & size

    WhatsApp a few photos and rough measurements.

  2. Site visit

    We measure and check what sits behind the tiles.

  3. Written itemised quote

    Scope and price, line by line. No obligation.

  4. Choose finishes, then build

    Pick tiles and fittings, pay the agreed deposit, works begin.

Start with step one: send your photos.

Get My Quote

FAQ

Bathroom Renovation Questions, Answered

There is a damp patch on the ceiling under our upstairs bathroom in Kepong. What does that usually mean?

A stain below an upstairs bathroom often points to water passing through the floor, but the cause has to be confirmed on site. If waterproofing is needed, it starts from RM1,500 per job and is itemised in your quotation.

Do we have to retile the whole bathroom to redo waterproofing?

Waterproofing membrane goes under the tiles, so the affected floor area usually has to be opened up. How much tiling is involved depends on the condition found at the site visit, and both items are priced separately in the quotation.

Is the site visit tied to signing up for the work?

No. Quotations are no-obligation. You receive a written, itemised quotation after the visit and decide whether to go ahead. Work begins only once you accept it and pay the agreed deposit.

What do the package prices cover?

Each range is an estimate for that level of finish. Every quotation covers materials, labour, waterproofing and cleanup, and the final price depends on your bathroom's size, the materials you choose and the scope.

Can I supply my own tiles or fittings?

Yes. You can supply your own materials and we handle the installation, or we source them for you as part of the quotation.

What happens if damaged pipes are found behind the tiles?

We stop, photograph the problem, explain it and price the extra work. Nothing proceeds until you approve it.

Do you take single jobs, like a shower screen only?

Yes. Tiling, waterproofing, plumbing, shower screens, vanities and bathtub-to-shower conversions are each quoted on their own.

Nearby

Bathroom Renovation Near Kepong

Other towns in Kuala Lumpur & Putrajaya we take enquiries from.

Finished bathroom with stacked petrol-green tiles and brass fittings (illustrative image)

Start here

Send Your Bathroom Photos, Get a Written Scope

A few photos and rough measurements are enough to begin.

Get My Quote