Full Bathroom Renovation
The whole room, stripped back and rebuilt.
- Hacking and disposal
- New floor and wall tiles
- Waterproofing
- Plumbing upgrade
FromRM5,000per project

Selangor
From the SS neighbourhoods to the USJ grid, Subang Jaya has a lot of family bathrooms that have done their years. Let's look at yours.
Subang Jaya
Subang Jaya's SS and USJ neighbourhoods are largely terrace and semi-detached homes, with apartments clustered around the colleges and commercial centres. Many of these houses still have a shower curtain, a pedestal basin and wall tiles from when the estate was built. A common upgrade is the Standard package, RM8,000 – RM15,000, which brings porcelain tiles, a full waterproofing membrane, a glass shower screen, a rain shower head and a vanity cabinet. Subang Jaya owners can send photos on WhatsApp; site-visit availability is confirmed in the reply.
Services
Every price is a starting price for that job. Your quotation sets the final figure.
The whole room, stripped back and rebuilt.
FromRM5,000per project
Floors and walls in porcelain, ceramic or mosaic.
FromRM25per sq ft
A waterproofing membrane under the finish.
FromRM1,500per job
Old pipes replaced, leaks fixed.
FromRM500per job
Tempered safety glass, made to your opening.
FromRM800per installation
Custom vanities and storage cabinets.
FromRM1,200per installation
Old bathtub out, walk-in shower in.
FromRM3,500per project
Every price above is a starting price. Your final price is set in the written, itemised quotation after a site visit.
Packages
Read across a row to see what changes between packages.
Indicative range
RM5,000 – RM8,000
A clean refresh on a careful budget.
Tiles
Basic tile replacement
Fixtures
Standard fixtures (basin, toilet)
Waterproofing
Basic waterproofing
Plumbing
Standard plumbing
Shower
Not listed
Vanity & mirror
Not listed
Options & extras
Not listed
Indicative range
RM8,000 – RM15,000
Modern finishes with glass and storage.
Tiles
Premium porcelain tiles
Fixtures
Quality fixtures & fittings
Waterproofing
Full waterproofing membrane
Plumbing
Not listed
Shower
Shower screen + rain shower head
Vanity & mirror
Vanity cabinet
Options & extras
Not listed
Indicative range
RM15,000 – RM30,000+
Designer materials and smart options.
Tiles
Designer tiles & natural stone
Fixtures
Premium branded fixtures
Waterproofing
Included (scope in quotation)
Plumbing
Not listed
Shower
Frameless glass shower screen
Vanity & mirror
Custom vanity & mirror cabinet
Options & extras
Underfloor heating option, smart toilet option, full electrical rewiring
Ranges are estimates. The final price depends on bathroom size, materials and scope, and every quotation covers materials, labour, waterproofing and cleanup.
Before & after
Drag the handle to compare. Your own photos are the starting point for your quote.


Before
After
Process
Four steps, each one agreed in writing before the next.
WhatsApp a few photos and rough measurements.
We measure and check what sits behind the tiles.
Scope and price, line by line. No obligation.
Pick tiles and fittings, pay the agreed deposit, works begin.
Start with step one: send your photos.
Get My QuoteFAQ
A screen keeps water inside the shower area, so the rest of the floor stays drier and easier to maintain. Tempered glass screens start from RM800 per installation, in frameless, semi-frameless or sliding styles.
The quotation itemises each part of the work, such as demolition, waterproofing, tiling, plumbing and fixtures, with quantities and prices. It also notes whether you or we supply tiles and materials.
Yes. Bathtub to shower conversion starts from RM3,500 per project, removing the tub and building a walk-in shower. The drainage position is checked on site before the price is finalised.
Each range is an estimate for that level of finish. Every quotation covers materials, labour, waterproofing and cleanup, and the final price depends on your bathroom's size, the materials you choose and the scope.
Yes. You can supply your own materials and we handle the installation, or we source them for you as part of the quotation.
We stop, photograph the problem, explain it and price the extra work. Nothing proceeds until you approve it.
Yes. Tiling, waterproofing, plumbing, shower screens, vanities and bathtub-to-shower conversions are each quoted on their own.

Start here
A few photos and rough measurements are enough to begin.
Get My Quote