October

Planning next month's bathroom budget? This month closes in

00 : 00 : 00 : 00

Send Photos →
Finished bathroom renovation with petrol-green stacked wall tiles, a floating oak vanity, brass tap and a frameless glass walk-in shower (illustrative image)

Pahang

Bathroom Renovation in Kuala Lipis: Packages, Prices & Process

Better Bathrooms, Thoughtfully Built, for homes in Kuala Lipis

Kuala Lipis was Pahang's state capital until the 1950s, and the town still shows its age in the best sense. Its older houses deserve bathrooms that work as well as the rest of the home.

Why homeowners start with BathWorks Malaysia

  • Prices on the page

    Starting prices and package ranges, before you ask.

  • Itemised written quote

    Final price set after a site visit, line by line.

  • No surprise extras

    Hidden damage is photographed and priced for your OK.

Kuala Lipis

What Shapes a Bathroom Renovation in Kuala Lipis

Kuala Lipis grew where the Jelai and Lipis rivers meet, and the former state capital still has colonial-era buildings, old shophouses and timber homes on its hillsides. Bathrooms in houses of this age often have original pipes, worn concrete floors and little or no waterproofing beneath the tiles. A full renovation from RM5,000 per project covers demolition, waterproofing, a plumbing upgrade and new tiling, while hidden issues are photographed and priced for approval. Kuala Lipis owners can enquire, and site-visit availability is confirmed on WhatsApp.

Services

Bathroom Renovation Services, One Job or the Whole Room

Every price is a starting price for that job. Your quotation sets the final figure.

Full Bathroom Renovation

The whole room, stripped back and rebuilt.

  • Hacking and disposal
  • New floor and wall tiles
  • Waterproofing
  • Plumbing upgrade

FromRM5,000per project

Quote This Job

Bathroom Tiling

Floors and walls in porcelain, ceramic or mosaic.

  • Floor and wall tiling
  • Porcelain, ceramic or mosaic
  • Tile supply confirmed in quotation

FromRM25per sq ft

Quote This Job

Bathroom Waterproofing

A waterproofing membrane under the finish.

  • Membrane application
  • Wet-area floor and wall base

FromRM1,500per job

Quote This Job

Bathroom Plumbing Upgrade

Old pipes replaced, leaks fixed.

  • Replace old pipes
  • Fix leaks
  • Upgrade bathroom plumbing

FromRM500per job

Quote This Job

Shower Screen Installation

Tempered safety glass, made to your opening.

  • Frameless, semi-frameless or sliding
  • Sliding or swing door
  • Custom sizes

FromRM800per installation

Quote This Job

Vanity & Cabinet Installation

Custom vanities and storage cabinets.

  • Wall-mounted or floor-standing
  • Vanity and storage cabinets

FromRM1,200per installation

Quote This Job

Bathtub to Shower Conversion

Old bathtub out, walk-in shower in.

  • Bathtub removal
  • Walk-in shower conversion

FromRM3,500per project

Quote This Job

Every price above is a starting price. Your final price is set in the written, itemised quotation after a site visit.

Packages

Three Renovation Packages, Scope Side by Side

Read across a row to see what changes between packages.

Essential

Indicative range

RM5,000 – RM8,000

A clean refresh on a careful budget.

Tiles

Basic tile replacement

Fixtures

Standard fixtures (basin, toilet)

Waterproofing

Basic waterproofing

Plumbing

Standard plumbing

Shower

Not listed

Vanity & mirror

Not listed

Options & extras

Not listed

Standard

Indicative range

RM8,000 – RM15,000

Modern finishes with glass and storage.

Tiles

Premium porcelain tiles

Fixtures

Quality fixtures & fittings

Waterproofing

Full waterproofing membrane

Plumbing

Not listed

Shower

Shower screen + rain shower head

Vanity & mirror

Vanity cabinet

Options & extras

Not listed

Premium

Indicative range

RM15,000 – RM30,000+

Designer materials and smart options.

Tiles

Designer tiles & natural stone

Fixtures

Premium branded fixtures

Waterproofing

Included (scope in quotation)

Plumbing

Not listed

Shower

Frameless glass shower screen

Vanity & mirror

Custom vanity & mirror cabinet

Options & extras

Underfloor heating option, smart toilet option, full electrical rewiring

Ranges are estimates. The final price depends on bathroom size, materials and scope, and every quotation covers materials, labour, waterproofing and cleanup.

Before & after

Before and After: A Tired Bathroom, Rebuilt

Drag the handle to compare. Your own photos are the starting point for your quote.

Dated bathroom with small pink wall tiles and a built-in bathtub before renovation (illustrative image)
The same bathroom after renovation with a walk-in glass shower, petrol-green tiles and an oak vanity (illustrative image)

Before

After

Bathtub to walk-in shower conversion in a terrace house bathroom

Process

How a Bathroom Renovation Moves from Photos to Handover

Four steps, each one agreed in writing before the next.

  1. Send photos & size

    WhatsApp a few photos and rough measurements.

  2. Site visit

    We measure and check what sits behind the tiles.

  3. Written itemised quote

    Scope and price, line by line. No obligation.

  4. Choose finishes, then build

    Pick tiles and fittings, pay the agreed deposit, works begin.

Start with step one: send your photos.

Get My Quote

FAQ

Bathroom Renovation Questions, Answered

Our house is several decades old. Is there anything special to consider?

Older bathrooms often hide original pipes and floors without a waterproofing layer. The site visit checks these first, and anything unexpected found later is photographed and priced for your approval. Mention the age of the house when you enquire.

Can a bathroom in a timber house be renovated?

Bathrooms in timber houses can be renovated, but the structure and floor need checking carefully first. Send clear photos of the bathroom floor, walls and surroundings on WhatsApp so the site visit can assess what is practical.

Can I supply salvaged or heritage-style tiles?

Owners may supply their own tiles and materials. Let us know the type and quantity when you enquire; installation is then quoted for those items. Some older tiles need extra preparation, which the site visit will flag.

What do the package prices cover?

Each range is an estimate for that level of finish. Every quotation covers materials, labour, waterproofing and cleanup, and the final price depends on your bathroom's size, the materials you choose and the scope.

Can I supply my own tiles or fittings?

Yes. You can supply your own materials and we handle the installation, or we source them for you as part of the quotation.

What happens if damaged pipes are found behind the tiles?

We stop, photograph the problem, explain it and price the extra work. Nothing proceeds until you approve it.

Do you take single jobs, like a shower screen only?

Yes. Tiling, waterproofing, plumbing, shower screens, vanities and bathtub-to-shower conversions are each quoted on their own.

Nearby

Bathroom Renovation Near Kuala Lipis

Other towns in Pahang we take enquiries from.

Finished bathroom with stacked petrol-green tiles and brass fittings (illustrative image)

Start here

Send Your Bathroom Photos, Get a Written Scope

A few photos and rough measurements are enough to begin.

Get My Quote