October

Planning next month's bathroom budget? This month closes in

00 : 00 : 00 : 00

Send Photos →
Finished bathroom renovation with petrol-green stacked wall tiles, a floating oak vanity, brass tap and a frameless glass walk-in shower (illustrative image)

Kuala Lumpur & Putrajaya

Bathroom Renovation in Setapak: Packages, Prices & Process

Better Bathrooms, Thoughtfully Built, for homes in Setapak

Whether it is your own home or a unit you rent out near the colleges, a Setapak bathroom can be refreshed without guesswork on price.

Why homeowners start with BathWorks Malaysia

  • Prices on the page

    Starting prices and package ranges, before you ask.

  • Itemised written quote

    Final price set after a site visit, line by line.

  • No surprise extras

    Hidden damage is photographed and priced for your OK.

Setapak

What Shapes a Bathroom Renovation in Setapak

Setapak is home to older flats, terrace houses and a large student population around its college campuses, so plenty of bathrooms here belong to rented rooms and units. Landlords often want hard-wearing tiles, a simple shower screen in place of a curtain, and a compact vanity that survives frequent tenants. Shower screens start from RM800 per installation and vanity units from RM1,200. If you own a property in Setapak, WhatsApp us photos of each bathroom; site-visit availability is confirmed in the chat.

Services

Bathroom Renovation Services, One Job or the Whole Room

Every price is a starting price for that job. Your quotation sets the final figure.

Full Bathroom Renovation

The whole room, stripped back and rebuilt.

  • Hacking and disposal
  • New floor and wall tiles
  • Waterproofing
  • Plumbing upgrade

FromRM5,000per project

Quote This Job

Bathroom Tiling

Floors and walls in porcelain, ceramic or mosaic.

  • Floor and wall tiling
  • Porcelain, ceramic or mosaic
  • Tile supply confirmed in quotation

FromRM25per sq ft

Quote This Job

Bathroom Waterproofing

A waterproofing membrane under the finish.

  • Membrane application
  • Wet-area floor and wall base

FromRM1,500per job

Quote This Job

Bathroom Plumbing Upgrade

Old pipes replaced, leaks fixed.

  • Replace old pipes
  • Fix leaks
  • Upgrade bathroom plumbing

FromRM500per job

Quote This Job

Shower Screen Installation

Tempered safety glass, made to your opening.

  • Frameless, semi-frameless or sliding
  • Sliding or swing door
  • Custom sizes

FromRM800per installation

Quote This Job

Vanity & Cabinet Installation

Custom vanities and storage cabinets.

  • Wall-mounted or floor-standing
  • Vanity and storage cabinets

FromRM1,200per installation

Quote This Job

Bathtub to Shower Conversion

Old bathtub out, walk-in shower in.

  • Bathtub removal
  • Walk-in shower conversion

FromRM3,500per project

Quote This Job

Every price above is a starting price. Your final price is set in the written, itemised quotation after a site visit.

Packages

Three Renovation Packages, Scope Side by Side

Read across a row to see what changes between packages.

Essential

Indicative range

RM5,000 – RM8,000

A clean refresh on a careful budget.

Tiles

Basic tile replacement

Fixtures

Standard fixtures (basin, toilet)

Waterproofing

Basic waterproofing

Plumbing

Standard plumbing

Shower

Not listed

Vanity & mirror

Not listed

Options & extras

Not listed

Standard

Indicative range

RM8,000 – RM15,000

Modern finishes with glass and storage.

Tiles

Premium porcelain tiles

Fixtures

Quality fixtures & fittings

Waterproofing

Full waterproofing membrane

Plumbing

Not listed

Shower

Shower screen + rain shower head

Vanity & mirror

Vanity cabinet

Options & extras

Not listed

Premium

Indicative range

RM15,000 – RM30,000+

Designer materials and smart options.

Tiles

Designer tiles & natural stone

Fixtures

Premium branded fixtures

Waterproofing

Included (scope in quotation)

Plumbing

Not listed

Shower

Frameless glass shower screen

Vanity & mirror

Custom vanity & mirror cabinet

Options & extras

Underfloor heating option, smart toilet option, full electrical rewiring

Ranges are estimates. The final price depends on bathroom size, materials and scope, and every quotation covers materials, labour, waterproofing and cleanup.

Before & after

Before and After: A Tired Bathroom, Rebuilt

Drag the handle to compare. Your own photos are the starting point for your quote.

Dated bathroom with small pink wall tiles and a built-in bathtub before renovation (illustrative image)
The same bathroom after renovation with a walk-in glass shower, petrol-green tiles and an oak vanity (illustrative image)

Before

After

Bathtub to walk-in shower conversion in a terrace house bathroom

Process

How a Bathroom Renovation Moves from Photos to Handover

Four steps, each one agreed in writing before the next.

  1. Send photos & size

    WhatsApp a few photos and rough measurements.

  2. Site visit

    We measure and check what sits behind the tiles.

  3. Written itemised quote

    Scope and price, line by line. No obligation.

  4. Choose finishes, then build

    Pick tiles and fittings, pay the agreed deposit, works begin.

Start with step one: send your photos.

Get My Quote

FAQ

Bathroom Renovation Questions, Answered

I rent out a unit in Setapak. Can I renovate two bathrooms under one quotation?

Yes. Send photos of both bathrooms and we can price them together after one site visit. Each bathroom's works are itemised separately, so you can decide to proceed with one or both.

Which items hold up best in a bathroom shared by several tenants?

Owners often choose sturdy floor tiles, a tempered-glass shower screen instead of a curtain, and a wall-mounted vanity that keeps the floor easy to clean. Options and their prices are set out in the quotation for you to choose from.

Can the work be done while tenants are still living there?

Sometimes. Works can be arranged section by section where the layout allows, which may let occupants keep using part of the space. Whether it is practical for your unit is assessed during the site visit.

What do the package prices cover?

Each range is an estimate for that level of finish. Every quotation covers materials, labour, waterproofing and cleanup, and the final price depends on your bathroom's size, the materials you choose and the scope.

Can I supply my own tiles or fittings?

Yes. You can supply your own materials and we handle the installation, or we source them for you as part of the quotation.

What happens if damaged pipes are found behind the tiles?

We stop, photograph the problem, explain it and price the extra work. Nothing proceeds until you approve it.

Do you take single jobs, like a shower screen only?

Yes. Tiling, waterproofing, plumbing, shower screens, vanities and bathtub-to-shower conversions are each quoted on their own.

Nearby

Bathroom Renovation Near Setapak

Other towns in Kuala Lumpur & Putrajaya we take enquiries from.

Finished bathroom with stacked petrol-green tiles and brass fittings (illustrative image)

Start here

Send Your Bathroom Photos, Get a Written Scope

A few photos and rough measurements are enough to begin.

Get My Quote